Description:
This edge gutter roll forming machine was exported to Australia on 2016. We used all components that meet Australian standards, specially we pay more attention to electric cabinet. We have exported slitting line, gutter roll forming machine, cable tray roll forming machine, roof/wall panel roll forming machine and door frame roll forming machine to Australia so far.
Decoiler--Hydraulic cut--Rollers--Roller former --Out Table
Gutter Roll Forming Machine |
||
Machinable Material : |
A) Aluminum |
Thickness(MM): 0.4-0.6 |
B) Copper |
||
C) Galvanized steel |
||
D) Galvalume |
||
Yield strength : |
250 - 350 Mpa |
|
Tensil stress : |
300 Mpa-500 Mpa |
|
Decoiler : |
Manual decoiler |
* Hydraulic decoiler (Optional) |
Forming station : |
16-20 |
* According to your profile drawings |
Main machine motor brand : |
Shanghai Dedong (Sino-Germany Brand) |
* Siemens (Optional) |
Driving system : |
Chain drive |
* Gearbox drive (Optional) |
Machine structure: |
Wall panel station |
* Torri station (Optional) |
Forming speed : |
10-15 (M/MIN) |
* Or according to your profile drawings |
Rollers’ material : |
Steel #45 |
* GCr 15 (Optional) |
Cutting system : |
Post-cutting |
|
Frequency changer brand : |
Yaskawa |
* Siemens (Optional) |
PLC brand : |
Panasonic |
* Siemens (Optional) |
Power supply : |
380V 50Hz 3ph |
* Or according to your requirment |
Machine color : |
Industrial blue |
* Or according to your requirment |
1.Q: What kinds of experience do you have in producing gutter roll forming machine?
A: We have experience of exporting our gutter roll formers to South Africa, Australia, Kyrghyzstan, Russia, Southeast Asia, Mexico and etc. We have produced OG big one gutter, half round gutter, edge gutter, HK gutter, VG gutter and C square gutter.
2.Q: What parts of rainwater system are included?
A: Rainwater system mainly consist of gutter roll forming machine and downspout pipe roll forming machine. And all product shapes can be customized according to your requirements, whether it is a square pipe, a round pipe or a heterogeneous pipe.
3.Q: What is delivery time of gutter roll forming machine?
A: 40 days to 50 days depends on your drawing.
4.Q: What is your machine speed?
A: Machine’s working speed depends on drawing. Normally line forming speed is around 12m/min.
5.Q: How could you control your machine’s precision and quality?
A: Our secret to producing such precision is that our factory has its own production line, from punching moulds to forming rollers, each mechanical part is completed independently by our factory self. We strictly control the accuracy at each step from design, processing, assembling to quality control, we refuse to cut corners.
6.Q: What is your after-sales service system?
A: We don’t hesitate to give you a two-years warranty period for whole lines, five years for motor: If there will be any quality problems caused by non-human factors, we will handle it immediately for you and we will be ready for you 7X24H. One purchase, lifetime care for you.
7. Q: How to visit our company when you arrived in China?
A: --Arrived at Beijing International Airport: Take the high-speed train from Beijing South Railway Station to Wuxi East Railway Station. It would take around 4 hours, we will wait for you at Wuxi East Railway Station and pick you up to our factory.